ASARCO Ray – Mineral Creek Tunnel Water Quality Balance
Project management, electrical engineering, and instrumentation for the Mineral Creek Tunnel water-quality balance system at ASARCO Ray.
Project management, electrical engineering, and instrumentation for the Mineral Creek Tunnel water-quality balance system at ASARCO Ray.
Electrical engineering for the South 32 mine interconnection pipeline system.
Electrical engineering services for a new production line expansion at a Hyundai-Transys manufacturing facility.
Arc-flash hazard analysis and equipment labeling for a Silgan Plastics packaging manufacturing facility.
Electrical engineering feasibility study and design for new well and tank sites at Santa Rosa Ranch for the Bureau of Indian Affairs.
Electrical engineering design for water-quality improvement facilities at Resolution Copper Mine.
Professional engineering to update the power-study model and NFPA 70E arc-flash analysis for the Pit Sonora substation at ASARCO Ray.
Systems integration to upgrade I/O and power-quality data collection at the Tres Rios Water Reclamation Facility, including design, configuration, and coordination.
On-call electrical, instrumentation, and controls engineering for El Paso Water’s Eastwood arsenic treatment facility.
Electrical engineering and systems integration for a lift station serving Global Water Resources in Maricopa, Arizona.