Town of Gilbert – Layton Lakes Lift Station

Provided design, construction support, and post-construction support for upgrades at the Layton Lakes Lift Station. Scope consisted of evaluation and design to upgrade existing equipment and upgrade of the odor control, reduction of nearby generator noise level, and electrical/controls equipment.

Project photos coming soon.