Town of Marana – Park Reservoir Power Study & Programming
Power study and PLC programming for the Marana Park reservoir, Town of Marana.
Power study and PLC programming for the Marana Park reservoir, Town of Marana.
Professional electrical engineering for a new reservoir and booster pump station for Sahuarita Water Company.
A site-wide power study for the Fountain Hills Sanitary District.
On-call professional engineering and troubleshooting for back-up power generators across El Paso Water treatment plants.
Electrical and controls engineering supporting the Pima County RWRD energy master plan.
Arc-flash hazard analysis and equipment labeling for a Silgan Plastics packaging manufacturing facility.
Professional engineering to update the power-study model and NFPA 70E arc-flash analysis for the Pit Sonora substation at ASARCO Ray.
Systems integration to upgrade I/O and power-quality data collection at the Tres Rios Water Reclamation Facility, including design, configuration, and coordination.
CEI provided electrical engineering for a power study and design changes at the City of Yuma’s Desalting Water Treatment Plant, including system analysis and updated construction documents.